Intepro Systems is innovating with things that no one wants to try. Intepro was challenged with creating a DC load rack that was located to be inside a wind tunnel. This wind tunnel would simulate being in 40000ft elevation. The tester needed to dissipate current and have accurate voltage readings.

This was a unique challenge because some OEM parts have issues having accurate readings and operating at full potential. Intepro utilized its incredible engineering team and modified existing OEM equipment so that it would not be as affected by the altitude. Intepro Systems also utilized a 1km fiber link control system so that we could safely control the test station from outside the wind tunnel. This ingenuity and willing to work with our customers to solve their problems are what sets Intepro Systems apart.

Intepro Systems Solutions Success Story: ATE Load Rack Testing at 40,000 ft.

Problem: A customer required the ability to provide DC loading inside a wind tunnel simulating 40,000 ft elevation. Typical OEM parts required for testing were subject to derating outside of normal operating conditions (Temperature & Pressure) and accurate/reliable readings were needed.

Solution: Intepro used an innovative approach to modify the OEM equipment to minimize the atmospheric effects and employed a fiber link control system to ensure fidelity of required Measurements.

Image

In another instance where no other supplier wanted to spend the time investigating, Intepro Systems called upon its vast engineering experience to deliver a satisfactory solution. What challenges have you been told “no” to? Intepro is willing to listen.