Case studies
Systems that were specified, built, shipped and commissioned — with the channel counts, voltages and currents left in.
Where a customer is named, they were named on Intepro’s own site first. Where a figure came from somewhere else, the page says so.
- Battery, semiconductor and research
Three ATE programmes in Asia-Pacific
A 240-channel BMS and cell test system, a 1,500 A fuse tester, and an intermittent-operating-life rig for power semiconductors.
Read the case study → - Burn-in and environmental stress screening
Why the higher quote was the cheaper system
A 600 kW burn-in requirement at 800 VDC where Intepro quoted around $160,000 above the competition — and the energy saving covered the difference inside the first year.
Read the case study → - Data centre and telecom
Testing server power in the data centre
Why data centres run their own server hardware as a laboratory, and what a wide-range auto-ranging DC source does about the number of supplies you have to own.
Read the case study →